Development

Sr. No Category Work Details Probable date of completion Area/Beneficiaries
1 C.C ROAD Laying of CC ROAD FROM SAI BABA TEMPLE TO MUNICIPAL SCHOOL IN PORATA COLONY. 11/06/2018 160
2 Compound wall Construction of Compound wall to a length of 200Mtrs for Christain Burial Ground at Ward No.11 (Slum Area). 22/06/2018 110
3 Compound wall Construction of Compound wall to a length of 200Mtrs to Survey No.608 & 609A in LP No.40/93 at 29th Ward (Slum Area). 22/06/2018 150
4 Compound wall Construction of Compound wall to a length of 200Mtrs at Opposite BH Mahal layout LP no.421-87 in Sy.No.601 & 602-P (Slum Area). 22/06/2018 130
5 Compound wall Construction of Compound wall to a length of 140Mtrs to Sy.No.676 in LP.NO.235/83 in ward no. 23rd (Slum Area). 22/06/2018 120
6 COMPOUND WALL Construction of Compound Wall to a Length of 160 mtrs to Sy.No.656/A&B, 657/P, 674, 675 L.P.No.536/86 at Ward No.28 (Non Slum Area). 19/06/2018 280
7 C.C ROAD Laying of C.C.Road in Bindela Colony at 16th Ward. 22/06/2018 80
8 C.C ROAD Laying of C.C.Road from D.No.2/975-B to D.No.2/976-3 in 16th Ward. 22/06/2018 80
9 STREET LIGHT Providing of 28Watts LED Ligts and 120Watts LED lights by replacing of Existing 40W tube lights and 250Watts HPSV lamps in 16th Ward Jayanagar Colony S.T area and approach Roads. 19/06/2018 140
10 STREET LIGHT Providing of 28 Watts LED Lights and 120 Watts LED Lights by Replacing of Existing 40 W Tube Lights and 250 Watts HPSV Lamps in 27th Ward Vijayanagar Colony S.T area and Approach Roads. 19/06/2018 160
11 STREET LIGHT Providing of 28 Watts LED Lights and 120 Watts LED Lights by Replacing of Existing 40 W Tube Lights and 250 Watts HPSV Lamps in 32nd Ward Nandalapadu S.T area and Approach Roads. 19/06/2018 180
12 C.C ROAD Laying of C.C.Road at Dattatreya Temple in Porata Colony in 11th Ward. 17/11/2017 50
13 C.C ROAD Laying of C.C.Road from D.No.16/622 to 16/623 at Nandalapadu at 33rd Ward. 17/11/2017 60
14 C.C ROAD Laying of C.C.Road at D.No.16/42 to 16/47 at Sreenivasapuram in 30th Ward. 17/11/2017 70
15 C.C ROAD Laying of C.C road from D.No. 16/858-42-2 to End of the Road and D.No.16/858-33 to 16/858-34 in 32nd Ward. 80
16 C.C ROAD Laying of C.C.Road from D.No. 16/858-32 to End of the Road and D.No.16/858-34 to 16/858-39 in 32nd Ward. 17/11/2017 150
17 C.C ROADS Laying of C.C Road from 4/41-16 to end of the Road in 11th Ward. 17/11/2017 130
18 C.C ROADS Laying of C.C Road from Electrical Phole No: T2/28/16 to 15/773-8-1 in Bhagath Singh Nagar 29th ward. 17/11/2017 160
19 C C ROADS Laying of C.C.Road from D.No.16/215-58 to 16/275-326 in 33rd Ward. 17/11/2017 180
20 C C ROADS Laying of C.C.Road from D.No.16/810-2 to 16/659-1 in Church Road. 17/11/2017 280
21 WATER SUPPLY Laying of 150 mm dia AC Cl 15 Pipeline in the Place of Damaged Existing Pipeline from D.No. 3/101 to D.No. 3/111 in Putlur Road in 24th Ward. 11/01/2018 210
22 WATER SUPPLY Laying of 110 mm dia AC Cl 15 Pipeline in the Place of Damage Existing Pipeline from D.No.4/921 to D.No.4/854 in 9th Ward Ragithotapalem. 11/01/2018 160
23 WATER SUPPLY Laying of 200 mm dia AC Cl 15 Pipeline in the Place of Damaged Existing Pipeline from D.No. 5/315 to D.No.9/122 in Chintha Chettu Veedhi Chinna Bazar 4th Road. 11/01/2018 200
24 WATER SUPPLY Laying of 150 mm dia AC Cl 15 Pipeline in the Place of Damage Existing Pipeline from D.No.15/183-6 to D.No.15/209 in Gandhi Nagar 1st Ward. 11/01/2018 230
25 WATER SUPPLY Laying of 110 mm dia AC Cl 15 Pipeline in the Place of Damage Existing Pipeline from D.No.3/419 to D.No.13/339 and D.No. 3/375 to 3/356 in 18th Ward Reddyvaripalem. 11/01/2018 250

Pages