Sr. No Category Work Details Probable date of completion Area/Beneficiaries
26 STREET LIGHT Providing of 28 W LED and 120 W LED Lights with Poles and 3rd Wire Line including erection and by Replacing of Existing 40 W Tube Lights and 250 Watts HPSV Lamps in 31st Ward Nandalapadu S.C area and Approach Roads. 17/11/2017 290
27 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From C.B Road to 15/1010-1-E in Bhagathsingh Nagar in 29th ward. 17/11/2017 180
28 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From D.No.15/998-1 to 15/775-2, D.No. 15/998-1 to 15/998-7, D.No.15/974 to 15/987-4, D.No.15/940-1-B to 15/922-1 in Bhagathsingh Nagar in 29th ward. 17/11/2017 265
29 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From Bharathi School outside Street to 2/897, LG Show Room to D.No. 2/811 and D.No. 2/818 to 2/815 D.No. 2/819 to 2/819-7 and D.No. 2/896 to 2/903-10-A2 in Ambedhkar Nagar in 15th ward. 17/11/2017 180
30 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From R.K Hospital to 2/752-3 D.No. 2/767 to 2/901 to 2/739 and D.No. 2/864-1 to 2/855-2 in Ambedhkar Nagar in 15th Ward. 17/11/2017 210
31 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From D.No.2/1-4-10 to Pole No.A3/3, D.No.2/1-4-1 to Pole No.A3/23, 2/729-9-5 to END of the Road, D.No.2/729-9-5 to Pole No.Y/12, Y/12 to 16th ward starting, D.No.2/909-10 to 2/910-3D in Ambedhkar Nagar in 15th ward. 17/11/2017 180
32 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete from D.No. 2/686 to 2/729-9-5 in Ambedhkar Nagar and D.No.2/720 to 2/905 and D.No.2/889-5-B to 2/884 and D.No.2/866-1 to 2/860 and D.No. 2/873 to 2/883 and Pole No. A3/16 to 2/1-4-24-A in Ambedhkar Nagar in 15th Ward. 17/11/2017 290
33 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From D.No.2/686 to 2/729-9-5 and D.No.2/902 to 2/903-3-1A and D.No.2/902 to 2/902-5 and D.No.2/912 to 2/815-1 and D.No.2/785 to 2/789 and D.No.2/57-C to 2/64 and D.No.2/66 to 2/60 and Pole No.A3/16 to 2/41-A and D.No.2/54-3 to 2/53 and D.No.2/12 to 2/14 in Ambedhkar Nagar in15th Ward. 17/11/2017 250
34 FOOT PATHS Providing of side Walks Both sides of Existing Internal Roads with Cement Concrete From D.No.15/825 to D.N.o15/817-9 and D.No.15/799-5 to End of The Road in Bhagathsingh Nagar in 29th ward. 17/11/2017 270
35 STREET LIGHTS Providing of 28Watts LED and 120Watts LED lights with Poles and 3rd Wire line including erection and by replacing of Existing 40W tube lights and 250Watts HPSV lamps in 29th Ward Bhagathsingnagar S.C area and approach Roads. 06/05/2017 160
36 STREET LIGHTS Providing of 28Watts LED and 120Watts LED lights with Poles and 3rd Wire line including erection and by replacing of Existing 40W tube lights and 250Watts HPSV lamps in 17th Ward Harijanawada S.C area and approach Roads. 06/05/2017 180
37 STREET LIGHTS Providing of 28Watts LED and 120Watts LED lights by replacing of Existing 40W tube lights and 250Watts HPSV lamps in 15th Ward Ambedkarnagar S.C area and approach Roads. 05/05/2017 180
38 C C ROADS Laying of C.C.Road from D.No. 2/51 at Vambay Colony in 15th Ward. 05/05/2017 45
39 C C ROADS Laying of C.C.Road from D.No.2/976-5 to 2/976-2 in 17th Ward 05/05/2017 30
40 UGD Laying of Under Ground Drainage Pipeline from D.No.16/858-42-2 to End of the Road & D.No. 16/858-33 to 16/858-34 & 16/858-32 to End of the Road and 16/858-39 in Nandalapadu. 05/05/2017 160
41 UGD Laying of Under Ground Drainage Pipeline from Pappur Road to D.No.16/545 to 16/622 to 16/623. 05/05/2017 130
42 C C ROADS Laying of C.C.Road from D.No.2/815-1 to End of the Road in 15th Ward. 05/05/2017 90
43 UGD Laying of Under Ground Drainage Pipeline from D.No.4/41-13 to Gowthami School and D.No.4/41-16 to End of the Road & D.No.4/42-4A to 4/41-24 in Porata Colony. 05/05/2017 50
44 UGD Providing of Under Ground Drainage from Yallanur Road to Opp.Gangamma Temple in Krishnapuram ‘0’ Road at 18th Ward. 20/04/2017 130
45 Drain Construction of C.C.Drain Repair near Banda Mosque at Chand Talkies area at 3rd Ward. 29/03/2017 80
46 Park Development of Landscape Works in Open Space at Bund Road area as Community Park (8.73 Acres) at Tadipatri, Anantapuramu District. 07/03/2017
47 Strom Water Drian Construction of Strom Water Drain in 18th ward from infront of Vani Junior College to Vijayalakshmi Theatre (Reach - 4). 17/03/2017 250
48 Strom Water Drain Construction of Strom Water Drain in 18th ward at Kalavagadda area to Putlur Road Krishnapuram 0 Road to Vani Junior College (Reach - 3). 17/03/2017 150
49 Strom water Drain Construction of Strom Water Drain in 23 ward at Kalavagadda area to Putlur Road and Krishnapuram 0 Road Junction. (Reach - 2) 14/03/2017 110
50 Strom water 14Drain Construction of Strom Drain in 23rd Ward at Kalavagadda Street from House No. 13/840 to House No.13/689 (REACH No.1). 14/03/2017 120